top of page
Care South_Gillingham_05-jpg-170425032325_edited.jpg

Horse and jockey

Client: Parkway Developments
Service: Passive Fire Protection – Apartments, Communal Areas & Lift Shaft
Location: Shaftsbury 

Project Overview

Acorn Passive Fire Protection were appointed to deliver the full passive fire protection package at the Horse & Jockey residential development in Shaftesbury. With a mix of apartments, communal areas, and a central lift shaft, the project required precise, regulation-compliant fire-stopping to maintain compartmentation throughout the building. Our team worked in sync with other trades to ensure all installations were completed efficiently and to the highest standard.

​

Apartment Fire-Stopping

We completed a full suite of fire & smoke protection measures across every apartment, including:

  • 12 cable penetrations to compartment walls (≤40mm)

  • 6 pipe penetrations to compartment walls (≤60mm)

  • 3 service penetrations above entrance doors (≤40mm)

  • SVP penetrations through solid floors (≤200mm)

  • Ventilation duct sealing at compartment walls

Each penetration was fire-stopped to restore the fire resistance of compartment walls and floors, ensuring compliant separation between dwellings.

​

Communal Areas

Fire-stopping within shared spaces included:

  • Solid floor compound works with intumescent wraps to M&E risers

  • Service penetrations above communal entrance doors (≤40mm)

  • Fire-stopping to walls forming lobbies and riser compartments

  • Pipework penetration sealing throughout

These measures ensure safe evacuation routes and maintain compartment integrity in high-traffic areas.

​

Lift Shaft Protection

The lift core required enhanced smoke control measures and specialist installation, including:

  • Smoke seals to lift entrance doors

  • Batten & ablative batt systems

  • Fire & smoke protection to penetrations around mechanical, electrical and ventilation services

This ensures the shaft remains a protected vertical route, preventing fire and smoke spread between floors.

 
Project Delivery

Our work was completed alongside mechanical, electrical and ductwork teams, coordinating each phase to avoid delays and maintain site efficiency. All installations meet current British Standards and building control requirements.

 
Outcome

The Horse & Jockey development now benefits from fully certified passive fire protection across apartments, communal areas and the lift shaft. Parkway Developments received full documentation and sign-off, ensuring long-term compliance and peace of mind.

Fern-Brook-Lodge-header-1.jpg
81381_1906220533417_edited_edited.jpg

Acorn Passive Fire Protection

Unit B Canford Business Park, Magna Road,

Wimborne, Dorset, BH21 3AP

​

Copyright @ 2025 Acorn Group Ltd

​

T: 01202 582 356 

E: fire@acorn-gm.co.ukuk

For regular updates, follow us on our socials:

  • Facebook
  • LinkedIn
bottom of page